Quiz-summary
0 of 10 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
Time has elapsed
You have reached 0 of 0 points, (0)
Categories
- Not categorized 0%
-
You have completed the test and took the first step to obtain the VCA certificate!
The official Basic VCA exam consists of 40 questions, last 60 minutes and the cut-off mark is 2580/4000 points (64,5%).
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Answered
- Review
-
Question 1 of 10
1. Question
You have to repair a gas pipe in the crawl space of a flat. The crawl space smells very stuffy and is hot and damp. You do not trust it, and you decide not to do the work. Who do you need to inform?
Correct
Incorrect
-
Question 2 of 10
2. Question
Ilonka van Gorkum has to demolish a structure, together with her colleagues. Ilonka is the holder of the werkvergunning (work permit). The werkvergunning (work permit) is valid for one day. What is obligatory?
-
Ilonka needs to check whether her colleagues adhere to the conditions in the permit.
After the end of the activities, all colleagues have to sign the werkvergunning (work permit).
The issuer of the werkvergunning (work permit) must explein the activities to the colleagues of Ilonka.
Correct
Incorrect
-
-
Question 3 of 10
3. Question
What do you need to do in the situation below?
Correct
Incorrect
-
Question 4 of 10
4. Question
You took some medicine this morning. The medicine can make you dizzy. It can also reduce your ability to react. You receive a werkvergunning (work permit) at the start of the working day. What do you need to do before you start your work?
Correct
Incorrect
-
Question 5 of 10
5. Question
You are working in a workshop where hand tools are used. Now a milling machine will be placed in the workshop. This will be the first machine in the workshop that makes noise. Put the preventive measures in the correct order. Put the best measure at the top.
Sort elements
- Purchase a machine with a low sound level
- Set up acoustic insulation screens around the machine
- Set up the workshop so the sound level at the workplace is not too high
- Wear ear muffs
-
1
-
2
-
3
-
4
Correct
Incorrect
-
Question 6 of 10
6. Question
Match the activities to the correct eye and face protection devices.
Sort elements
- Cleaning work with a high-pressure cleaner
- Cleaning work with a cleaning product on a ceiling
- Cleaning work with a hazardous liquid
- Gas welding
Correct
Incorrect
-
Question 7 of 10
7. Question
You are working on a pile-driving rig. While the pile is bing driven, the measured sound level is 105 dB(A). Which hearing protection devices provide sufficient protection? Several answers can be correct.
Correct
Incorrect
-
Question 8 of 10
8. Question
You have to shorten timber to make a window frame that fits. You use a hand-held circular saw for this. What is correct? Several answers can be correct.
Correct
Incorrect
-
Question 9 of 10
9. Question
A house needs to be renovated. You are asked to install a wooden ceiling. You use an electric nail gun for this. The sound level during the work is 80 dB(A). What is correct?
-
You have to press the head of the machine firmly to the ceiling.
You need to wear hearing protection.
The nail gun must be inspected every 2,5 years.
Correct
Incorrect
-
-
Question 10 of 10
10. Question
What is a precaution against the dangers of electrocution?
Correct
Incorrect